Portfolio (5 projects)

Jun 2024 - Jan 2025

Changi Airport Terminal 5 - MBC SAM

Mott MacDonald Singapore Pte LtdBIM Coordinator
AutoCADACCNavisworksRevitAirportElectricalFire ProtectionACMVPlumbing & Sanitary
  • Liaised with Consultant section leads to provide suitable model solutions for specific areas and MEP services, maintaining serviceability and accessibility throughout the project lifecycle
  • Led and coordinated a team of 7 BIM modellers across various MEP services to complete all deliverables within the client's specified timeline, enhancing project efficiency and client satisfaction
  • Implemented BIM model change management processes to track and manage modifications, ensuring updates were accurately reflected and communicated among stakeholders
  • Applied project management methodologies to monitor daily team progress, ensuring effective task delegation and alignment with project timelines
  • Performed comprehensive space planning analysis for MEP coordination, aligning designs with client requirements and regulatory standards while optimizing available space for MEP services
  • Modelled MEP services including Fire Protection, fuel pipes, ACMV, Electrical & GLX, and Sanitary systems based on detailed space planning analysis provided by the main contractor
  • Prepared the Sanitary model for authority submission, ensuring compliance with regulatory requirements and facilitating the approval process
  • Prepared reference material on PUB Code of Practice technical and modelling details to increase consistency and compliance in Sanitary modelling works
  • Prepared clash detection reports highlighting areas of poor model quality and proposed solutions, enhancing model integrity and communication among stakeholders
Mar 2015 - Jan 2016

Tuas Water Reclamation Plant CSD1/CSD2

Asia Energy Engineering & Consultant Pte LtdBIM Manager
NavisworksOpenPlantProjectWisePlantElectrical
  • Managed a single As-Built project contract spanning CSD1 and CSD2, with direct reporting lines to 3 contracts
  • Coordinated design briefs between the Singapore BIM team and the China BIM team, managing a combined team of 10 professionals
  • Liaised with engineering managers, lead design engineers, and design engineers specializing in Electrical and Instruments, Control, and Automation (E/ICA) for respective project packages
  • Collaborated with the main contractor's team on design-related documents including cable schedule computation and relay calculations, managed BIM model clash submissions, and interfaced with third-party subcontractors
  • Supported the client in building and expanding the Singapore BIM team, including modellers, coordinators, design engineers, and professional engineers, and coordinated BIM workflows and site installation programs with affiliated companies
  • Designed cable trays, ladders, and support systems in OpenPlant based on main contractor-provided cabling engineering drawings
  • Exported Bills of Materials (BOM) directly from BIM models to support procurement material tracking
  • Reviewed BIM models and coordinated clash detection activities with main contractors and subcontractors using Navisworks Freestyle
  • Supported site teams in expediting installation processes through real-time BIM coordination in Navisworks
  • Implemented internal quality control by conducting 2D drawing and BIM model checks prior to uploading deliverables to ProjectWise
  • Conducted training sessions for new modellers and management personnel on interpreting 2D drawings, utilizing BIM tools for installation support, and enhancing on-site efficiency
  • Designed cable tray and cable racket routing using actual tray dimensions based on equipment and instrument counts, coordinating with design engineers to finalize models and 2D drawings
  • Interpreted Single Line Diagrams (SLD) to inform electrical cable ladder and tray routing decisions
  • Aligned project scheduling with main contractor construction timelines, advising site teams on installation sequencing based on BIM model analysis and 2D drawing availability
  • Conducted weekly site surveys to verify installation compliance with BIM models and resolved onsite clashes between services
  • Updated SCA opening drawings promptly to accommodate clash resolutions and coordinated cabling schedules under tight deadlines