3D Services

BIM Consultants Singapore

From Design to Construction to Handover, work with experienced BIM Consultants to comply with local BIM requirements and standards.

Why Choose Us?

Here's why firms work with our BIM consultants

Certified Professionals

All coordinators are DDM-certified and have 3+ years’ experience coordinating Architecture, Structural, and MEP models.

ISO 19650 Compliant

Ensure 3D models comply with URA, BCA, and SCDF requirements, meeting IFC+SG & CORENET standards for BIM submissions.

On-site Support

Set weekly calls and on-site walkdowns to coordinate trades and resolve issues early

Top BIM Consultants in Singapore

Get end-to-end BIM compliance support with our expert BIM Coordinators and ISO 19650 Compliant BIM Data Environment.

WHAT'S INCLUDED
Certified BIM Teams
CORENET X Submissions
ISO 19650 Compliant
BIM Software

Ready to get started?

Let's Talk

From Our Clients

Highly recommended — skilled team, always on time, and great at solving 3D model issues fast.

John Lester Baconawa

Senior Project Engineer

Peak Top Engineering Pte Ltd

MEP Coordination

Excellent service — responsive, technically strong, and delivered on time consistently.

Masita Deei

Technical Project Manager

Vector Foiltec Pte Ltd

BIM Modeling

Outstanding quality and turnaround time. Excellent technical advice and very prompt responses.

Princess Rogando

Design Engineer

Concord Corporation Pte Ltd

Structural BIM

Good quality of advice, timely follow-up, and solid deliverables. Service met our expectations.

Chris

Manager

KEEHANS PTE LTD

BIM Coordination

Ben is very helpful and professional. Great experience working with the Bimeco team.

Kurita - Yanping

Manager

Kurita Singapore

BIM Services

How It Works

Here's our approach to quality BIM delivery

Project Specifications Analysis

Share your tender and BIM requirements. We review scope, standards, LOD requirements, and submission deliverables, and ensure that key submission milestones are met.

1

Web Dashboard Setup

We configure an ISO 19650–compliant Common Data Environment (CDE) with proper role-based access controls and audit trails.

2

BIM Coordination

Onboard subcontractors and establish BIM workflows. We work with you to ensure BIM, 4D, 5D, 6D BIM deliverables are delivered to the project timeline.

3

Tools & Technologies

BIM tools like SketchUp, Revit, ArchiCAD, and Tekla have their unqiue advantages. We know how to use them all.

Sketchup
Archicad
Autodesk
Revit
Solibri

Benefits of BIM

Uses of BIM from Design, Construction, to Operations

Section image

Design Compliance

Deliver submission-ready models for CORENET X: coordinated, clash-free Architecture, Structural, and MEP models. Ensure designs comply fully with local building codes.

Section image

Virtual Design & Construction

Onboard your supply chain into an ISO 19650–compliant BIM Common Data Environment (CDE). Track project progress with 4D, 5D, and 6D BIM workflows.

Section image

Digital Twins for Facility Management

Deliver added value to asset operators with a BIM digital twin. Align the construction model with as-built conditions. Integrate asset information with COBie for Facilities Management (FM) to facilitate asset operations.

Our Portfolio

Real results from real projects. See how teams like yours saved time and reduced rework with Bimeco.

Residential Development – Bukit Timah

Residential Development – Bukit Timah

Coordinated Architectural and Structural BIM models eliminated design conflicts, reducing construction delays on this large residential compound.

Industrial Facility – Waste Treatment Plant

Industrial Facility – Waste Treatment Plant

Frequent clash checks across complex M&E systems minimized rework and kept the facility on track for on-time completion.

Infrastructure – DE 107 Rail Project

Infrastructure – DE 107 Rail Project

4D simulation linked to the construction schedule helped the team optimize site logistics and avoid costly schedule conflicts.

Industrial Facility – Tuas Water Reclamation Plant

Industrial Facility – Tuas Water Reclamation Plant

All clashes resolved before drawings were issued, resulting in coordinated outputs and fewer errors from design through construction documentation.

Conservation Project – Heritage Building

Conservation Project – Heritage Building (Scan to BIM Services)

Point cloud data converted to a BIM model in native and IFC formats, reducing renovation risk while preserving architectural heritage.

Frequently Asked Questions

Can we request your portfolio?+
What does a BIM Consultant do?+
Can you advise on Autodesk Construction Cloud?+
Can you help with CORENET X / IFC+SG submissions?+
Do you work on a retainer or project basis? What deliverables do we get?+
What do you need to get started?+

Need a BIM Consultant?

Work with our network of DDM-certified BIM professionals on your next project. Reach out for CVs matched to your scope.