
Tuas Water Reclamation Plant
JACOBS · SINGAPORE
Challenge
Jacobs coordinated multiple contract packages and thousands of BIM models for Singapore’s major water infrastructure programme.
Project outcomes
- ●75% reduction in model federation time, as reported by Jacobs
- ●Over 2,400 native BIM models coordinated in design
- ●Multidiscipline design tendering timelines reduced by 50%, per Bentley
Read case study: Bentley Systems, Jacobs Tuas Water Reclamation Plant case study





