
TH 169 freeway conversion at Elk River, Minnesota
Challenge
WSB redesigned Trunk Highway 169 as a freeway for MnDOT under a compressed CMGC schedule, coordinating design, right of way and construction quantities in one managed environment.
Results
- ●Over USD 12 million saved to date with Bentley's digital workflows, per Bentley
- ●USD 4.8 million saved for MnDOT in earthworks costs with real-time quantities on site
- ●58.7 miles of utilities relocated ahead of schedule after clash detection
- ●ProjectWise's 3D environment made right-of-way collaboration with MnDOT more efficient
Read case study: Bentley Systems, WSB TH 169 Elk River case study










